View

Carousel & offshoreequipment for Osbit.

Steel fabrication and assembly of a carousel and offshore equipment for Osbit, built in our workshop at GreenPort Pernis to the highest quality and safety standards.

ClientOsbit
SectorOffshore wind
ScopeSteel fabrication & assembly
StandardsEN-ISO 3834 · CPR EN 1090
LocationGreenPort Pernis
The project

Built to spec, delivered on time

Osbit develops advanced handling and access equipment for the offshore and offshore wind industries. For this project, SupTech Construction took care of the steel fabrication and assembly of a carousel and several pieces of offshore equipment.

The work was carried out in our well-equipped workshop at GreenPort Pernis, under the guidance of a dedicated project manager and coordinator. From the first drawings to the final assembly, quality control and safety were built into every step.

  • Work preparation and planning
  • Cutting, fitting and assembly of steel structures
  • Certified welding (EN-ISO 3834)
  • Dimensional and visual quality checks
  • Fabrication of structures to CPR EN 1090
  • Coordination with the client and delivery planning
Challenge · Approach · Result

How we made it work

01

The challenge

Large, complex steel components with tight tolerances, delivered within a strict schedule and in line with offshore quality requirements.

02

Our approach

Careful work preparation, certified welding procedures and step-by-step quality checks — with one point of contact throughout the project.

03

The result

Components fabricated and assembled to specification, safely and on time, ready for their next step towards offshore operation.

Our approach

From request to delivery

Careful planning, clear communication and priority to safety. This is how we approach every project.

01

Request & inspection

You get in touch and we quickly assess the situation — on board, on location or at our yard.

02

Planning & quotation

A clear quotation at the best price, backed by careful and realistic planning.

03

Execution

Led by a dedicated project manager and coordinator, using the latest technology with safety first.

04

Punctual delivery

Delivered on time, in line with the standards of class societies and maritime authorities.

Have a similar project? Let's talk.

Share your drawings or a short description. We respond with a clear plan and quotation.